Claremont Place Newcastle consisted of 89 existing student flats and common areas which required stripping as well as needing reinstating to Empiric branding. This was a complicated project which was to be completed within a challenging timescale and budget.

Main Contractor:
Horbury Joinery
Client:
Empiric Student Property
Sector:
Accommodation
Package Value:
£1.215m
Companies Involved
Horbury JoineryServices provided
Drylining and Partitioning Carpets, Vinyl and Timber Flooring Joinery Refurbishment & MaintenanceSectors
ResidentialHorbury Joinery Ltd undertook the following works:
- Rewired and replaced distribution boards, power outlets data and lighting
- Replaced sanitaryware, radiators and flush systems
- Repaired and rebalanced existing ventilation systems and installed a new AC system into the gym
- Re-decorated throughout the building i.e. replacing all flooring, installing new furniture such as beds, shelving, wardrobes, desks and bookcases
- Altered the layout of the top floor of the building to accommodate new flats which included bedrooms, bathrooms and kitchens
- Converted existing bedrooms to create a common room, gym, cinema and laundry room.
Horbury Joinery Ltd acted as a principle contractor coordinating all trades and working closely with the client’s design team. The entire project was completed within the summer holiday period and delivered to budget.