The Light Cinemas, Sheffield

This project consisted of supplying and fixing acoustic dry-lining to the 9 screen cinema and shopping centre also installing stainless steel suspended ceilings to the shopping centre.

Main Contractor:

Bowmer and Kirkland

Client:

The Light Cinemas

Sector:

Leisure and Commercial

Package Value:

£1.33m

Companies Involved

Titan Interior Solutions

Sectors

Retail

Titan Interior Solutions Ltd undertook the following works:

  • Acoustic partitions to the cinema and shopping centre up to 13.5m high and constructed to give 120 minutes fire resistance
  • Acoustic bulkheads and mass barrier ceilings to cinema and shopping centre
  • Internal partitions to 5 retail units
  • Feature ceilings to the shopping centre with perforated panel inserts
  • Soffit insulation above the feature ceilings
  • Minor works to Primark, and a further 4 retail units facing onto The Moor, these works being mainly column and beam encasements along with external IWL’s.

The main issue Titan Interior Solutions Ltd faced during this project was that the vomitory wall steelwork never ran parallel with cinema walls. In this instance a wider stud was instructed by Titan to overcome the problem on site. Another issue faced was that precast concrete seating was installed prior to our commencement on site. If these were left out it would have allowed more access for MEWP’s to construct the auditorium walls and mass barrier ceilings. To overcome this problem, a scaffolding contractor had to be employed to scaffold above precast seating areas.