Manchester Airport T2
Main Contractor:
Laing O'Rourke
Client:
MAG
Sector:
Aviation
Package Value:
£10.5m
Companies Involved
Titan Interior SolutionsSectors
InfrastructureThis project forms part of the £600m Manchester Airport Transformation Programme. Titan Interior Solutions were responsible for a multi-trade contract of Ceilings, Partitions, Demountable Glazed Screens and the Toilet Fit Out package in the Terminal 2 Building.
Ceilings and Partitions (£8.5m)
Titan's works included the installation of over 12km of partitions and wall linings. The complex installation consisted of over 30 different wall types and included Bespoke Shaftwall Systems, Security Walls, Lead-Lined
Walls and the installation of Steel ‘goal posts’ for heavyweight doors.
Demountable Glazed Screens (£500k)
The Glazed Screen package consisted of the installation of high performance screens including high acoustic and fire screens as well as bomb blast screens and steel frame supports.
Toilet Fit Out (£1.5m)
Consisted of the installation of Walls, Metal Ceilings, Bulkheads, Toilet Cubicles, Hygiene Wall Cladding & Flooring.